Cranes shall also be operated within the Federal Aviation Administration (FAA) guidelines. In addition, the crane shall be operated in accordance with all local, state, and federal guidelines. The crane operator shall be familiar with and shall follow manufacturer operating procedures in order to safely operate the crane. Periodic Monthly Inspections by a competent person.ĭeficiencies identified in any wire rope inspection must be documented, categorized, and corrected as indicated in the standard before any work can begin.Annual Inspection by a qualified third party (other than the crane company).
CRANE LIFT RADIUS VERIFICATION
Prior to beginning work on the site, the crane subcontractor must provide verification of the following wire rope inspections:
Daily inspections should be conducted by a competent person prior to each shift. If equipment has been idle for 3 months or greater, a monthly inspection must be conducted by a competent person prior to use on the site. Periodic Monthly Inspections by a competent person. Annual Inspection by a qualified party. Post-assembly inspection by a qualified person to verify that the crane was configured in accordance with the manufacturer equipment criteria. Prior to beginning work on the site, the crane subcontractor must verify the following inspections: If a manufacturer’s inspection criteria exceed the requirements as defined in the OSHA standard, the crane must be inspected to meet the criteria of the manufacturer. All cranes must also meet the design, construction, and testing criteria as set forth in. Princeton University has determined that the plan and checklist are necessaryĬranes must meet periodic inspection criteria as defined in the OSHA standard. The crane is being used to lift personnel. If the lift involves multiple cranes, a system must be instituted by the controlling entity to coordinate operations. Whenever the load and/or travel radius is expected to travel over any portion of an occupied building. The load exceeds 75 % of the crane’s load chart. A pre-lift meeting to review the plan, must be held before the actual lift, and be attended by the operator rigger(s), competent person and others as required.Ī Critical Lift Plan and Critical Lift Checklist must be completed by the subcontractor and submitted to Princeton University Project Manager when any of the following conditions exist:. Applicable rigging to be used as well as precautions and safety measures. The name of the Operator, Rigger and Competent Person. The plan may include sketches showing lifting points, methods of attachment, sling angles, load vectors, boom and swing angles, crane orientations, related capacities, and other factors affecting the equipment and lifting operation. A list of items to be lifted/moved, including a description of each item’s weight, dimensions, center of gravity, and presence of hazardous toxic materials.
CRANE LIFT RADIUS SERIAL NUMBER
The type, size, model, lifting capacity, certification date and serial number of the crane to be used.A lift plan must be provided to the Princeton University Project Manager for review and approval, prior to performing any lifting operations.